Carbonization Plant Delivery To Europe

· Product: Biomass Carbonization plant

· Country: Europe

08
31,
2023
Author:mingjie

At the end of August, our biomass carbonization plant has been delivered to Europe. The row material of our client is wood chips and this type of plant could process 1ton per hour. About the material of reactor, it's 304 stainless steel.

The plant is expected to arrive in Europe at the end of September, Mingjie engineer will leave for Europe at the beginning of October.

Get a Free Quote

Related Products

Related Project

Two sets of semi-continuous waste tires pyrolysis plant
10
13,
2015

· Product: semi-continuous waste tires pyrolysis plant
· Country: Australia

What can we help you with?